NAV Project Planning

Diagram Content

The Planning of Projects consists of two levels:

  • The project task line of the first level are required, otherwise no bookings for the project are made.
  • The second level consists of planning lines, which determine the detailed use of resources, articles and so on.

You use this project lines to list the expectations of the project. It may be a plan (which articles, resources and so on are expected to be used) or a contract (agreement with the debtor about what he hast to pay for the project).

You can design lines for each sub-activity of the project. If you have agreed with the customer to charge a total amount for the whole project (regardless of consumption for each sub-project activities), you only need to create a single line of type “contract” for the whole project.

Activities

  1. Conduct risk analysis
    • Used in process: Project Planning
    • Type: Generic
  2. Define phase plan
    • Used in process: Project Planning
    • Type: Generic
  3. Define schedule
    • Used in process: Project Planning
    • Type: Generic
  4. Develop milestone plan
    • Used in process: Project Planning
    • Type: Generic
  5. If necessary, update project plan
    • Used in process: Project Planning
    • Type: Generic
  6. NAV Create project structure plan
    • Used in process: Project Planning
    • Type: Dynamics NAV
    • NAV Link: NAV Job Task Lines
  7. NAV Define capacity plan
    • Used in process: Project Planning
    • Type: Dynamics NAV
    • NAV Link: NAV Job Task Lines
  8. NAV Define cost plan
    • Used in process: Project Planning
    • Type: Dynamics NAV
    • NAV Link: NAV Job Task Lines
  9. Set operating plan
    • Used in process: Project Planning
    • Type: Generic

Applications

  1. NAV - PRO
    • Application type: Module
    • Category: ERP

Processes

  1. Project Controlling and Management
    • Identification: PRO-020-040
    • Process type: Value creation process
    • Category: Processes
    • Process area: PRO
    • Process owner: Head of Project Management
    • Status: STD
    • Process model: NAV
    • Description: Project planning and control are essential elements of project management. Projects can only be controlled effectively if they are planned carefully. This includes notably the establishment of project organization, the written fixation of a project contract, the disposition of the whole project into separate time periods, the determination of the project tasks and their time scheduling and planning of the necessary resources and the anticipated costs. The services provided, the costs and time consumptions have to be monitored constantly. In the case of deviations it is necessary to take appropriate actions. The module projects in Microsoft Dynamics NAV 5.0 offers various options for displaying statistics for project control. Some statistics are in the form of windows, and other statistics are reports. In one of the reports the user has the ability to change the content.
  2. Project Execution
    • Identification: PRO-020-030
    • Process type: Value creation process
    • Category: Processes
    • Process area: PRO
    • Process owner: Head of Project Management
    • Status: STD
    • Process model: Generic
    • Description: Project postings pursue the primary goal to book the whole project consumption on articles, resources, or G/L accounts. In addition, these postings may be a tool to coordinate resources. Each project-related booking generates project entries. A distinction is made between positive and negative entries; positive entries increase your costs, negative entries are sales to the debtor.
  3. Project Initiation
    • Identification: PRO-020-010
    • Process type: Value creation process
    • Category: Processes
    • Process area: PRO
    • Process owner: Head of Project Management
    • Status: STD
    • Process model: Generic
    • Description: The process of project initiation embraces all preparing activities to create and start a project. With this process the frame conditions for the project have to be clarified (e.g. what are project objectives, how is the project budget, who are the project sponsors).

Roles

  1. Project Assistant
    • Shape name: PROJ AS
    • Role type: Role
  2. Project Manager
    • Shape name: PROJ MAN
    • Role type: Role